Development History

  • 1972

    The first 18kW wind turbine in China, abreakthrough in medium-sized wind turbine in China.

  • 1997

    200kWwind turbine , the state-level scientific achievement.

  • 1999

    250kWwind turbine, the earliest wind turbine put into commercial use in China.

  • 2003

    WD49-750wind turbine, by Repower technology, over 500 units installed, availabilityover 97%. in operation for over 6 years.

  • 2006

    Getthe order of national authorized project in Danjinghe, Hebei province.

  • 2008

    WD1.5MWseries, the first wind turbine using latest load optimization controltechnology in China, was developed and put into batch production.

  • 2010

    ZheinagWndey Co., Ltd. is established through the shareholding reform.

    Windeybecomes the executor of State Key Laboratory of Wind Power System.

    2.5MW prototype completed.

  • 2011

    First Award for Scientific and Technology Progress in Zhejiangprovince.

    Selected as the Working Station for Academicians.

  • 2012

    1.5MWpast Low Voltage Ride Through Test by China Electrical Power Research Institute.

    Zhejiang key Laboratory of Wind Power System was completed.

  • 2013

    The first wind turbine exported to Iran succeeded in trial run.

    The post-doctoral working station starts.

  • 2014

    Special Award of China Mechanical Science was granted to Windeyfor the project “High-power Wind Turbine Development and Demonstration”.

  • 2015

    The registered trade mark was nominated as the Provincial FamousTrade Mark.

    The research institute under Windey’s administration was honoredas the “Key Research Institute of Zhejiantg Province”.

    The State Key Laboratory of Wind Power System was and approved bythe Ministry of Science.