1972
The first 18kW wind turbine in China, abreakthrough in medium-sized wind turbine in China.
-
1997
200kWwind turbine , the state-level scientific achievement.
-
1999
250kWwind turbine, the earliest wind turbine put into commercial use in China.
-
2003
WD49-750wind turbine, by Repower technology, over 500 units installed, availabilityover 97%. in operation for over 6 years.
-
2006
Getthe order of national authorized project in Danjinghe, Hebei province.
-
2008
WD1.5MWseries, the first wind turbine using latest load optimization controltechnology in China, was developed and put into batch production.
-
2010
ZheinagWndey Co., Ltd. is established through the shareholding reform.
Windeybecomes the executor of State Key Laboratory of Wind Power System.
2.5MW prototype completed.
-
2011
First Award for Scientific and Technology Progress in Zhejiangprovince.
Selected as the Working Station for Academicians.
-
2012
1.5MWpast Low Voltage Ride Through Test by China Electrical Power Research Institute.
Zhejiang key Laboratory of Wind Power System was completed.
-
2013
The first wind turbine exported to Iran succeeded in trial run.
The post-doctoral working station starts.
-
2014
Special Award of China Mechanical Science was granted to Windeyfor the project “High-power Wind Turbine Development and Demonstration”.
-
2015
The registered trade mark was nominated as the Provincial FamousTrade Mark.
The research institute under Windey’s administration was honoredas the “Key Research Institute of Zhejiantg Province”.
The State Key Laboratory of Wind Power System was and approved bythe Ministry of Science.